Motorline Professional LINCE 600 Double-Leaf Swing Gate Opener Kit (Kit-Economy-2114)

Double-leaf swing garage door kit with two Motorline Professional LINCE 600 operators, ProfelmNet 2114 control panel in a waterproof plastic box, and one remote control.

  • Electromechanical operator with permanent lubrication
  • Maximum leaf width (with electric lock): up to 4.0 m
  • Maximum leaf width (without electric lock): up to 2.5 m
  • Maximum number of cycles per hour: up to 21 at 20°C
  • Maximum number of cycles per day: up to 30
  • Piston stroke (effective): 60 cm
  • Maximum force: 2300 N
  • Single-phase motor. Motor operating voltage: 230 VAC
  • Motor absorbed power: 2x180 W
  • Motor winding thermal protection: 120 °C
  • Manual release with special hexagonal key
  • Warranty: 2 years

To order this product, please call us at 210.555.0632 or purchase it online from our eshop.

Contents of the LINCE 600 (Kit-Economy-2114) set

Motorline Professional LINCE 600 double-leaf swing garage door operator kit (Kit-Economy-2114)
Our proposal for the LINCE 600 (Kit-Economy-2114) set includes:
  • LINCE 600 operator, 2 pcs
  • ProfelmNet PS-2114N control panel installed in a waterproof box, 1 pc
  • 1 ProfelmNet PSD-36T remote control at 433.92 MHz with 4 buttons
  • All necessary accessories for the installation and operation of the mechanism (mounting brackets and screws for the motor, capacitor, 2 release keys, and installation instructions)

Manufactured by the Portuguese company Electrocelos, known for the reliability and durability of its products.

The LINCE 600 operator can move gate leaves with a width of up to 2.5m without an electric lock and with a width of 4.0m using an electric lock.

The above kit can be installed for the automation of a swing garage door. Depending on your needs, additional products such as remote controls, photocells, etc. can be added to the kit.

LINCE 600 Mechanism - Dimensions

lince 600 dimensions

Operator with very convenient dimensions, suitable for most gate types.

Swing Gate Operator Installation - Specifications

The installation of a swing gate operator is a relatively simple matter, provided that careful attention is paid to certain dimensions. These dimensions are as follows:

  • The width of the left and right gate leaves WL & WR respectively.
  • The distances CL, DL & CR, DR. These dimensions are important when the operator is installed on the same side from which the gate opens. (Conversely, when the gate opens outwards and the operator is inside or vice versa, these dimensions do not play a role, but the clear passage width is reduced).
  • The maximum number of gate opening/closing cycles per day and per hour.
  • The design of the gate. What interests us about the design is whether it allows air to pass through without resistance. That is, a wrought iron gate is the best case, while a solid gate without gaps is definitely a gate that can face problems when strong winds prevail.

Our company is always ready to assist you in choosing the appropriate operator for your gate. You can contact us by phone or email, and we will guide you in selecting the motor for your gate. It is essential to know the above information, and in case of email correspondence, photos of the gate and the installation point of the operators would facilitate our selection.

Analysis of critical dimensions for swing gate operator selection

WL, WR: width of each gate leaf

CL, CR: open each leaf 90o and measure the distance perpendicular to the gate from a possible obstacle (structural element, tree, etc.)

DL, DR: Measure perpendicular to the closed gate the distance from the installation point of the operator's base to the point where the gate hinge is installed.

double leaf gate spaces for motor

We measure the distances from the center of the hinge for greater accuracy:

swing operator distances from hinge

Visual checks during swing gate operator installation

The first point of inspection during the installation of a swing gate operator is whether there is space for the arm. We open the gate 90o and observe if there is space behind it for the operator. If the gate abuts a structural element or another obstacle (such as the right leaf in the diagram below), then an operator cannot be installed without modifying the gate or creating the appropriate space. (In this specific case, excavating the structural element and creating space for the motor)

inability to install right swing arm

Depending on the user's needs, the gate can be of an open or closed type. Open types allow visibility and air passage, as they are usually made of railings. Conversely, closed types do not allow visibility to and from the area and, of course, wind passage. This often makes movement difficult as wind pressure exerts great forces on the gate and consequently on the mechanism. Therefore, in areas where strong winds prevail, it is wrong to install a mechanism on a solid swing gate. In the best case, the gate will not operate correctly (it will partially close) when there is wind pressure, and there are several chances that the mechanism will be damaged.

This point requires particular attention as the warranty of any manufacturer does not cover damages due to wind pressure. In many cases, we could have better gate performance by installing a stronger mechanism and/or an electric lock. In most cases, however, our advice is not to install a swing mechanism on a solid gate unless it is protected from strong wind pressures. (e.g., in densely populated areas, if there is a tall building in front, etc.)

double leaf swing gate wind pressure

Also, a basic prerequisite for installing an operator on a swing gate is that it must operate perfectly manually and have mechanical stops.

Mechanical stops define the end of the gate's travel in both the open and closed positions.

Double leaf swing gate stops

Swing gate operator installation distances - Operating modes

Swing operators can operate in 2 ways:

1st way: They pull the gate to open it and push it to close it.

2nd way: They push the gate to open it and pull it to close it.

The following diagrams analyze the operation of a swing gate. The gate rotates around an axis (H) defined by its hinges (from their center).

The motor is supported by 2 joints:

  1. The first is fixed and is the point where the mechanism is attached to the structural element. (P1)
  2. The second is movable and is the point where the mechanism is attached to the gate. (P2)

These three points H, P1, P2 define a triangle with fixed sides H-P1 & H-P2 and one with a variable length P1-P2. Depending on the installation method, the length P1-P2 increases when the gate opens and decreases when it closes, or vice versa.
The distance from the center of rotation of the mechanism to the center of rotation of the gate (H-P1) determines the operation of the mechanism. This is defined by the distances X and Y, which are clearly visible in the next diagram.

These distances are determined by the manufacturer of the mechanisms and must be observed during installation. A detailed table with these distances follows below.

Also, to determine point P2, we follow this procedure: In the first installation method, after we have defined point P1, we define point P2 at a distance Le where the piston is extended almost to the end of its stroke. In the second installation method, after we have again defined point P1, we define point P2 at a distance Lc where the piston is retracted almost to the limit of its stroke.

The following are detailed diagrams and tables where S2 and S1 are the stops for the open and closed positions respectively.

1st method of swing gate operator installation

right swing arm distances

lince 600 installation dimensions

This installation method is the most widespread and offers the most advantages, as it does not alter the gate's design, the mechanisms are inside the property and thus protected, and the clear opening width remains the same as before the mechanism's installation. The only drawback is that specific spaces are required for the mechanism's placement.

2nd method of swing gate operator installation

single leaf swing right swing arm

This installation method is rarely used. The motor is installed between the opening and pushes the gate to open it, while pulling it to close it. It offers advantages, the most important being the possibility of installation even when the necessary spaces required in the first installation method are not available. Also, the mechanism does not alter the appearance of the gate and is inside, so it is protected. Disadvantages of this method are that it reduces the clear passage width and that the gate opens outwards, so there is a risk for pedestrians, etc.

Double-leaf swing garage door - wiring

Double-leaf swing gate wiring

  • (1) The operator requires a 4x1.5mm² or 4x2.5mm² cable if the distance of the automation installation point is far from the control panel. (It is advisable for the operator to be on a separate fuse in the control panel). The cable must be waterproof and in a conduit with a diameter of at least Φ16. The remaining length that the electrician will leave must be sufficient (1.5m) to reach the installation point of the electronic control panel.
  • (2) Wired photocells require a 4×0.6mm² cable for the receiver and a 2×0.6mm² cable for the transmitter. We usually place the receiver close to the mechanism and the panel. If it is impossible to run a cable across for the photocells, we can install reflective photocells, which only require wiring from one side. (So line 2 is not required)
  • (4) For push-button (or key-switch) a 2x0.5mm² cable is required (not included in the kit)
  • (5) The remote control receiver requires a 3x0.5mm² cable (in our case, it is integrated into the panel)
  • (6) The safety flashing light requires a 2x1.5mm² cable (not included in the kit)
  • (7) The electric lock requires a 2x1.5mm² cable (not included in the kit)

Notes:

  • Single or double-leaf gate requires one control panel.
  • Heliflex type PVC flexible conduits are most suitable for this type of installation.
  • Wiring must be protected and watertight to prevent short circuits, etc.

ProfelmNet PSD-36T swing gate remote controls

Swing gate remote control

The ProfelmNet PSD-36T remote control has 4 buttons, on which we can program 4 different mechanisms. It is a fixed 12-bit code at 433.92 MHz. It is easy to use, well-designed, and works perfectly with the control panels of swing mechanisms.

Manual release of Lince 600 swing gate operator

Steps for manual release of the swing gate operator:

Unclip the protective cover:

protective cover of Lince 400 manual release

Check the special marking for the opening direction:

Lince 400 manual release marking

Insert the manual release key:

Lince 400 release key

Rotate the key 180o as shown in the diagram below:

Lince 400 manual release procedure

The manual release procedure is complete. The gate can now be moved by hand. Reverse the procedure to return the mechanism to electrical operation.

Lince 600 operator installation instructions

The kit is delivered with instructions in Greek, which are easy to follow provided one has basic knowledge and "is handy". Otherwise, it is advisable to call a specialized technician.

The instructions include detailed steps for installing the operator base, the operator itself, and all accessories that a swing kit may contain (photocells, remote controls, flashing light, antenna, etc.)

Instructions in English for the motor can be found at the following link: Lince 600 operator instructions EN